21686
| 0 | | Transfer for P+R - bridge repair | Resolution | A RESOLUTION transferring $127,500.00 within the 2024 General Fund to replace a pedestrian bridge along the Little Blue Trace Trail damaged by a severe storm, utilizing an existing term and supply contract. | recommend do pass | Pass |
Action details
|
Video
|