File #: 20462    Version: Name: Tfr P+R Projects
Type: Resolution Status: Passed
File created: 7/16/2020 In control: Legislature As A Whole
On agenda: 7/20/2020 Final action: 9/14/2020
Title: A RESOLUTION transferring $142,074.00 within the 2020 County Improvement Fund to cover the design costs of three projects to make critical and mandated repairs in the Jackson County parks system as identified by the Missouri Department of Natural Resources.
Sponsors: Theresa Cass Galvin
Indexes: DESIGN ENGINEERING SERVICES, JACKSON COUNTY PARKS, REPAIR AND RESTORATION
Attachments: 1. 20462bu.pdf, 2. 20462bu revised.pdf, 3. 20462bu amendment.pdf, 4. 20462adopt.pdf
IN THE COUNTY LEGISLATURE OF JACKSON COUNTY, MISSOURI

Title
A RESOLUTION transferring $142,074.00 within the 2020 County Improvement Fund to cover the design costs of three projects to make critical and mandated repairs in the Jackson County parks system as identified by the Missouri Department of Natural Resources.


Intro
RESOLUTION NO. 20462, July 20, 2020

INTRODUCED BY Theresa Cass Galvin, County Legislator


Body
WHEREAS, the Parks + Rec Department is in the process of developing design and engineering plans to address three critical projects for facilities that will be permitted through the Missouri Department of Natural Resources (MoDNR); and,

WHEREAS, the total project costs are estimated in an amount not to exceed $750,000.00; and,

WHEREAS, one project will replace the wastewater treatment facility for the Lake Jacomo campground and boat dock with the construction of a new on-site, self-contained, no-discharge treatment facility meeting current MoDNR regulations; and,

WHEREAS, the second project will repair deteriorated portions of the concrete spillway at Prairie Lee Lake; and,

WHEREAS, the third project will repair deteriorated portions of the concrete spillway at Lake Jacomo; and,

WHEREAS, once design and engineering plans are prepared for each project, contracting for construction services shall be procured following the requirements of chapter 10 of the Jackson County Code, including competitive bidding and/or the use of approved term and supply vendors; and,

WHEREAS; a transfer is now necessary to place the funds required for the design of the projects in the proper spending account; now therefore,

BE IT RESOLVED by the County Legislature of Jackson County, Missouri, that the following transfer be and hereby is made within the 2020 County Improvement Fund:
DEPARTMENT/DIVISION CHARACTER/DESCRIPTION FROM TO

County Improvement Fund
Non-Departmental -
Cnty Imprvmnt
013-5113 56790-
Other Contractual Services $142,074
Const...