File #: 18169    Version: 0 Name: Utility Relocation Agreement - MGE
Type: Resolution Status: Passed
File created: 5/13/2013 In control: Public Works Committee
On agenda: 5/13/2013 Final action: 5/20/2013
Title: A RESOLUTION authorizing the County Executive to execute a Cooperative Utility Relocation Agreement with Missouri Gas Energy for the relocation of gas lines in private easements relating to improvements on Lee's Summit Road, 40 Highway to Anderson Road, Project No. 3122, at a cost to the County not to exceed $1,179,275.00.
Sponsors: Bob Spence
Indexes: LEE'S SUMMIT ROAD, MO GAS ENERGY, UTILITY RELOCATION AGREEMENT
Attachments: 1. 18169adopt.pdf, 2. 18169AGMT.pdf
IN THE COUNTY LEGISLATURE OF JACKSON COUNTY, MISSOURI





Title
A RESOLUTION authorizing the County Executive to execute a Cooperative Utility Relocation Agreement with Missouri Gas Energy for the relocation of gas lines in private easements relating to improvements on Lee's Summit Road, 40 Highway to Anderson Road, Project No. 3122, at a cost to the County not to exceed $1,179,275.00.


Intro
RESOLUTION NO. 18169, May 13, 2013

INTRODUCED BY Bob Spence, County Legislator


Body
WHEREAS, by Resolution No. 16911, dated May 18, 2009, the Legislature did authorize the Director of Public Works to execute a Memorandum of Understanding with the cities of Kansas City, Missouri, and Lee=s Summit, Missouri, in connection with improvements to Lee=s Summit Road between 40 Highway and Anderson Drive, Project No. 3122; and,

WHEREAS, by Resolution 17197, dated March 8, 2010, the Legislature did authorize an agreement for engineering design services in connection with the improvements to Lee=s Summit Road; and,

WHEREAS, this Project is scheduled for construction during 2014 and 2015; and,

WHEREAS, Missouri Gas Energy (MGE) has an existing eight-inch high pressure main and an existing sixteen-inch high pressure transmission line along Lee's Summit Road in private utility easements, which are in conflict with the proposed roadway improvements; and,

WHEREAS, the estimated cost for MGE to relocate its utility lines is $1,179,275.00; and,

WHEREAS, the Director of Public Works recommends the execution of the attached agreement with MGE for the relocation of gas lines related to the Lee=s Summit Road between 40 Highway and Anderson Drive, Project No. 3122; and,

WHEREAS, the Director also recommends the use of Kansas City CURS bond funds to cover the cost of this relocation project; and,

WHEREAS, the execution of the attached agreement is in the best interest of the health, safety, and welfare of the citizens of Jackson County, now therefore...