Public Works
Committee Substitute
November 23, 2009
IN THE COUNTY LEGISLATURE OF JACKSON COUNTY, MISSOURI
Title
AN ORDINANCE repealing sections 5400., and 5410., Jackson County Code, 1984, relating to the building code, and enacting, in lieu thereof, two new sections relating to the same subject, with an effective date.
Intro
ORDINANCE #4171, November 16, 2009
INTRODUCED BY Bob Spence, County Legislator
Body
WHEREAS, it is appropriate that the County's Building Code be amended to provide better defined guidelines and enforcement of the code consistent with International Building Code provisions; and,
WHEREAS, the amendments will provide more defined requirements as to what is required for permitting; now therefore,
BE IT ORDAINED by the County Legislature of Jackson County, Missouri, as follows:
Section A. Enacting Clause. Sections 5400., and 5410., Jackson County Code, 1984, are hereby repealed, and two new sections enacted in lieu thereof, to be known as sections 5400. and 5410., to read as follows:
5400. Building Code.
Certain documents, copies of which are on file and are open for inspection by the public in the offices of the director of public works, being marked and designated as:
International Code Conference, [2006] 2009 Edition, published by the International Code Council; and, International Building Codes, [2006] 2009 Edition, published by the International Code Council, as modified or amended in the [Uniform] International Building Code Standards referenced below:
[2006 International Building Code, except Chapter 29, Plumbing
2006 International Residential Code, except Chapter 27, Plumbing
2003 International Energy Code
2006 Uniform Mechanical Code
2006 Uniform Plumbing Code
2005 National Electrical Code
2006 International [Uniform] Fire Code
APWA Single Family Erosion Control Guidelines
International, American National Standard; (ADA) Accessible and Usable Buildings and Facilities
2006 International Building Code Appendices
C- Agricultural Buildings
E- Accessibility Regulations (ADA)
F- Rodent Proofing
G -Flood Restraint
H -Signs
I - Patio Covers
J - Grading
2006 International Residential Codes Appendices
Table R 301.2 (1):
Climate and Geographic Design Criteria
Ground Snow Load - 20 psf
Wind Speed (mph) - 90 with a 3 second gust
Seismic Design Category - A
Subject to Damage
Weathering Category - Severe
Frost Line Depth -36''
Termite Category- M-H
Appendices:
E- Manufactured Housing used as Dwellings
F- Radon Control Methods
G- Swimming Pools, Spa's, Hot Tubs
H- Patio Covers
J- Existing Buildings and Structures
- Home Day Care, R-3 Occupancy
Exemptions from the 2006 International Building Code:
Section 101.4.5 - Property Maintenance
Section 105.1.1 - Annual Permit
Section 105.1.2 - Annual Permit Records
Section 105.2(1) - Work Exempt From Permit]
2009 International Building Code
2009 International Residential Code
2008 National Electrical Code (NFPA 70)
2009 International Plumbing Code
2009 International Mechanical Code
2009 International Energy Conservation Code
2009 International Fire Code (as it relates to construction codes only)
2009 International Existing Building Code
APWA Single Family Erosion Control Guidelines
2008 National Green Building Standard ICC-700-2008 (Guideline only)
2009 International Building Code Appendices
C: Group U - Agricultural Buildings
E: Supplementary Accessibility Requirements
F: Rodent Proofing
G: Flood Resistant Construction
H: Signs
I: Patio Covers
J: Grading
K: Administrative Provisions (NFPA 70)
Chapter 9, section 903.2.8, residential fire protection systems (optional).
2009 International Residential Appendices
E: Manufactured Housing used as a dwelling unit
F: Radon Control Methods
G: Swimming Pools, Spas, and Hot Tubs
H: Patio Covers
K: Sound Transmission
M: Home Day Care R-3 Occupancy
N: Venting Methods
O: Gray Water Recycling Systems
P: Sizing of Water Piping System
Q: ICC Residential Code Electrical Provisions/National Electrical Code cross Reference
Chapter 3, section R313.2 One and two family dwellings automatic fire systems (optional).
2009 International Plumbing Code Appendices
C: Gray Water Recycling Systems
E: Sizing of Water Piping System
F: Structural Safety
G: Vacuum Drainage System
2009 International Mechanical Code Appendices
A: Combustion Air Openings and Chimney Pass-Throughs
2009 International Fire Code Appendices (as it relates to construction codes only)
B: Fire Flow Requirements for Buildings
C: Fire Hydrant Locations and Distribution
I: Fire Protection Systems - Noncompliant Conditions
2009 International Existing Building Code Appendices
A: Reference Standards
B: Supplementary Accessibility Requirements for Existing Buildings and Assemblies
Exemptions:
Exemptions from the 2009 International Building Code:
Section 101.4.2 - Property Maintenance
Section 105.1.1 - Annual Permit
Section 105.1.2 - Annual Permit Records
Section 105.2(1) - Work Exempt from Permit
Building:
1. One-story detached accessory structures used as tool and storage sheds, playhouses and similar uses, provided the floor area does not exceed 200 square feet.
Section 105.2.3 - Public Service Agencies
Referenced Codes:
Any and all references to the International Electrical Code shall reference the National Electrical Code.
[Any reference to the International Plumbing Code shall reference the Uniform Plumbing Code.
Any reference to the International Mechanical Code shall reference the Uniform Mechanical Code.]
as said publications may be amended, are adopted as the code of Jackson County for regulating the erection, construction, occupancy, equipment, use, height, area, and maintenance of all buildings or structures in the unincorporated area of Jackson County. Each and all of the regulations, provisions, conditions, and terms of such International Building Codes, [2006] 2009 Edition, and International Code Council, published by the International Code Council, and the secondary publications referenced above, as said publications may be amended, all of which are on file in the office of the director of public works, are referred to, adopted, and made a part hereof as if fully set out in this section.
5410. Fees.
No permit shall be issued pursuant to section 5409. of this chapter until the applicant therefor has paid the fee specified in this section, to include a plan review fee if applicable, based on the fair market value of the proposed improvement for which the permit is sought as established by the most current building valuation data as set forth in the International Conference of Building Officials Standard Publication:
5410.1 [BUILDING PERMIT FEES] Fee Schedule.
Total Valuation Fee
$1.00 to $500.00 $25.15
$501.00 to $2,000.00 $25.15 for the first $500.00 plus $3.27 for
each additional $100.00, or fraction thereof,
to and including $2,000.00
$2,001.00 to $25,000.00 $74.10 for the first $2,000.00 plus $14.98 for
each additional $1,000.00, or fraction thereof,
to and including $25,000.00
$25,001.00 to $50,000.00 $418.64 for the first $25,000.00 plus $10.81 for
each additional $1,000.00, or fraction thereof,
to and including $50,000.00
$50,001.00 to $100,000.00 $688.81 for the first $5,000.00 plus $7.49 for
each additional $1,000.00, or fraction thereof,
to and including $10,000.00
$100,001.00 to $500,000.00 $1,063.31 for the first $100,000.00 plus $5.99
for each additional $1,000.00, or fraction thereof, to and including $500,000.00
$500,001.00 to $1,000.00.00 $3,460.11 for the first $50,000.00 plus $5.08
for each additional $1,000.00, or fraction thereof, up to and including $1,000,000.00
$1,000,000.00 and up $6,001.36 for the first $1,000,000.00 plus $3.91 for each additional $1,000.00 or fraction thereon.
Agricultural-use pole barns valued at $20,000.00 or less are exempt from the above valuation chart. These structures shall be assessed a flat fee of $125.00. Agricultural-use pole barns valued at $20,000.00 up to $40,000.00 will be assessed a flat fee of $300.00. All barns valued above $40,000.00 will be assessed a fee consistent with the Building Permit Fees Schedule contained in this [Chapter] section. When the building official has determined that unauthorized work, as defined in the International Building Code, has been performed without first obtaining proper permits, permit fees shall be double the normal fee.
5410.2 [Plan Review Fees] Fees, Plan Review.
A plan review fee of 65 percent of the building permit fee shall be assessed in addition to the permit fee. The following buildings are exempt from the plan review fee, unless it is determined by the building official that the submitted documents are incomplete, changed, or are more complex than the basic design of said structures. a. Single Family Dwelling;
b. Detached Garages;
c. Utility Sheds, Pole Barns, Open Carports;
d. Mobile, Modular, Manufactured Homes;
e. Swimming Pools; and
f. Decks.
5410.3 Fees, Additional.
Additional fees, for inspections and other services, shall be due as set out below:
Services Fee
a. Inspections outside of normal business $47.00 per hour
hours (minimum charge-two hours)
b. Re-inspection fees $47.00 per hour
c. Inspections for which no fee $47.00 per hour
is specifically indicated
(minimum charge-one-half hour)
d. Additional plan review required $47.00 per hour
by changes, additions or revisions
to approved plans (minimum
charge-one-half hour)
e. Use of outside consultants for plan Actual cost, including validation,
review inspections, administrative and
overhead costs.
[5410.4 Public Agencies.]
[Whenever a public agency with taxing authority is the applicant for a permit, any fee in this section may be reduced or abated by the building official with the approval of the Director of Public Works for the purpose of conserving public tax resources.]
5410.[5] 4 Green Build Permit Program.
There is hereby established a Green Build Permit Program. Any construction for which fees are charged pursuant to this section shall be eligible to apply for certification under the Green Build Permit Program. There shall be four (4) levels of certification: Green, Silver, Gold, and Platinum. Points must be acquired in three (3) categories: Resources, Energy, and Indoor Air Quality IAQ) / Health, within fifteen requirement areas. A minimum of ten (10) points must be acquired in each category for a project to be eligible for certification and the partial fee rebate. Any applicant who has paid fees pursuant to this section shall be eligible for a partial rebate of those fees in accordance with the schedule set forth below:
Level of Certification Minimum Points Required Rebate Percentage
Green 50+ 15 %
Silver 70+ 25 %
Gold 125+ 35 %
Platinum 180+ 50 %
[The following criteria shall be used as basis for awarding points under this program:]
The criteria used as the basis for awarding points under this program shall be found in Section 5400, 2008 National Green Building Standard.
[
Points per category |
Resources |
Energy |
IAQ/Health |
A. Site |
|
|
|
1. Recycle job site construction & demolition waste 50% recycling rate required: 65%=1; 75%=2; 80%=4 |
Up to 4 |
|
|
2. Donate unused materials |
4 |
|
|
3. Protect native soil |
2 |
|
|
4. Minimize disruption of existing plants & trees |
1 |
|
|
5. Implement construction site stormwater practices |
2 |
|
|
6. Protect water quality with landscape design |
2 |
|
|
7. Design resource-efficient landscapes |
4 |
|
|
8. Reuse materials/use recycled content materials for landscape |
2 |
|
|
9. Install high-efficiency irrigation systems |
2 |
|
|
10. Provide for on-site water catchment/retention |
2 |
|
|
Available Points |
25 |
0 |
0 |
B. Foundation
1. Incorporate recycled flyash in concrete 15% recycled flyash = 2; add 1 pt for every 10% increase, up to 5 pts |
Up to 5 |
|
|
2. Reuse form boards |
1 |
|
|
3. Use aluminum forms |
3 |
|
|
4. Use recycled content aggregate |
2 |
|
|
5. Insulate foundation/slab before backfill |
|
3 |
|
6. Install rigid foam, insulated concrete forms (ICF) |
|
3 |
|
Available Points |
11 |
6 |
0 |
C. Structural Frame
1. Substitute solid sawn lumber with engineered lumber A. Floors B. Headers (non structural) C. Structural beams and headers |
1 1 1 |
|
|
2. Use FSC certified wood for framing (for every 10% of FSC lumber used=2 pts, up to 10pts |
Up to 10 |
|
|
3. Use wood I-joists for floors and ceilings |
2 |
|
|
4. Use steel interior web trusses |
2 |
|
|
5. Design energy heels on trusses |
|
2 |
|
6. Use OSB a. Subfloors b. Sheathing |
1 1 |
|
|
7. Use finger-jointed studs for non-structural vertical applications |
2 |
|
|
8. Use engineered studs for vertical applications |
2 |
|
|
9. Use recycled content steel studs for interior framing |
2 |
|
|
10. Use structural insulated panels (SIPs) a. Floors b. Walls c. Roof |
|
3 3 3 |
|
11. Apply advanced framing techniques |
4 |
|
|
12. Use reclaimed lumber for non-structural applications |
3 |
|
|
Available Points |
32 |
11 |
0 |
D. Exterior Finish
1. Use sustainable decking materials a. Recycled content b. FSC certified wood |
3 3 |
|
|
2. Use non-CCA treated wood |
|
|
1 |
3. Install house wrap under siding |
|
|
1 |
4. Use alternative siding materials a. Recycled content b. Fiber-cement |
1 3 |
|
|
Available Points |
10 |
|
2 |
E. Plumbing
1. Insulate all hot water pipes |
|
2 |
|
2. Install flow reducers a. Faucets (1 pt. each, up to 2 pts) b. Showerheads (1 pt. each, up to 2 pts) |
2 2 |
|
|
3. Install ultra-low flush toilets (1pt. each, up to 4 pts) |
Up to 4 |
|
|
4. Install chlorine filter on showerhead |
|
|
4 |
5. Install tankless water heater |
|
2 |
|
6. Pre-plumb for gray-water conversion |
4 |
|
|
7. Install water filtration units at drinking water facets (2 pts. Each, up to 4 pts.) |
|
|
Up to 4 |
8. Install on-demand hot water circulation pump |
4 |
|
|
Available Points |
16 |
4 |
8 |
|
|
|
|
|
|
|
|
F. Electrical
1. Install compact fluorescent bulbs-CFL's (6 bulbs=2 pts.; 12 = 4 pts.; up to 4 pts.) |
|
Up to 4 |
|
2. Install air-tight, insulation-compatible recessed fixtures for CFL's (1 pt. each, up to 5 pts.) |
|
Up to 5 |
|
3. Install lighting controls (1 pt. per fixture; up to 4 pts) |
|
Up to 4 |
|
4. Install high efficiency ceiling fans with CFLs (1 pt. each, up to 4 pts.) |
|
Up to 4 |
|
Available Points |
|
17 |
|
G. Appliances
1. Istall Energy Star dishwasher |
|
1 |
|
2. Install horizontal axis washing machine |
|
1 |
|
3. Install Energy Star refrigerator |
|
1 |
|
4. Install built-in recycling center |
3 |
|
|
Available Points |
3 |
3 |
|
H. Insulation
1. Upgrade insulation to exceed Title 24 requirement: a. Walls b. Ceilings |
|
2 2 |
|
2. Install recycled content, formaldehyde-free fiberglass installation |
|
|
3 |
3. Use advanced infiltration reduction practices |
|
2 |
|
4. Use cellulose insulation a. Walls b. Ceilings |
4 4 |
|
|
Available Points |
8 |
6 |
3 |
I. Windows
1. Install energy-efficient windows a. Double-paned b. Triple-paned c. Low-emissivity (Low-E) d. Low conductivity frames |
|
1 3 2 2 |
|
Available Points |
|
8 |
|
J. Heating, Ventilation and Air Conditioning (HVAC)
1. Use duct mastic on all duct joints |
|
1 |
|
2. Install ductwork within conditioned space |
|
3 |
|
3. Vent range hood to the outside |
|
|
1 |
4. Clean all ducts before occupancy |
|
|
2 |
5. Install attic ventilation system |
|
2 |
|
6. Install whole house fan |
|
4 |
|
7. Install sealed combustion units a. Furnaces b. Water Heaters |
|
|
3 3 |
8. Install 14 SEER/11 EER or higher AC with a TXV |
|
3 |
|
9. Install AC with non-HCFC refrigerants |
2 |
|
|
10. Install 90% annual fuel utilization efficiency (AFUE) furnace |
|
2 |
|
11. Eliminate wood burning fireplaces |
|
|
1 |
12. Install zoned, hydronic radiant heating |
|
3 |
|
13. Install heat recovery ventilation unit (HRV) |
|
5 |
3 |
14. Install high efficiency particulate air (HEPA) filter |
|
|
4 |
15. Install separate garage exhaust fan |
|
|
3 |
Available Points |
2 |
23 |
20 |
K. Renewable Energy and Roofing
1. Pre-plumb for solar water heating |
|
4 |
|
2. Install solar water heating system |
|
10 |
|
3. Pre-wire for future photovoltaic (PV) installation |
|
4 |
|
4. Install PV panels (1.2kw=6pts; 2.4kw=12pts; 3.6kw=18pts) |
|
Up to 18 |
|
5. Install solar (PV) walkway lights |
|
4 |
|
6. Install radiant barrier roof sheathing |
|
3 |
|
7. Install 20-year roofing |
|
1 |
|
Available Points |
|
44 |
|
L. Natural Heating and Cooling
1. Incorporate passive solar heating |
|
5 |
|
2. Install overhangs or awnings on south facing windows (24 inch. min.) |
|
3 |
|
3. Plant deciduous trees on the east, west, and south sides |
|
3 |
|
Available Points |
|
11 |
|
M. Indoor Air Quality and Finishes
1. Install whole house vacuum system |
|
|
3 |
2. Use low/no VOC paint |
|
|
1 |
3. Use low VOC, water-based wood finishes |
|
|
2 |
4. Use solvent-free adhesives |
|
|
3 |
5. Substitute particleboard with formaldehyde-free materials |
|
|
6 |
6. Use exterior grade plywood for interior uses |
|
|
1 |
7. Use formaldehyde-free MDF and materials |
|
|
4 |
8. Seal all exposed particleboard of MDF |
|
|
4 |
9. Use FSC certified wood for interior finish |
|
|
4 |
10. Use finger-jointed or recycled content trim |
1 |
|
|
Available Points |
1 |
|
28 |
N. Flooring
1. Select FSC certified wood flooring |
8 |
|
|
2. Use rapidly renewable flooring materials |
4 |
|
|
3. Use recycled content ceramic tiles |
4 |
|
|
4. Install natural linoleum or cork in place of vinyl |
|
|
5 |
5. Use exposed concrete as finished floor |
4 |
|
|
6. Install recycled content carpet with low VOCs |
4 |
|
|
Available Points |
24 |
|
5 |
O. Other
1. Incorporate listing of green features into cover of blueprints |
1 |
|
|
2. Develop homeowner manual of green feature/ benefits |
1 |
|
|
3. Offer coupons for compost bins to homeowners |
1 |
|
|
]
a. Rebates Authorized for Payment.
The Director of Finance and Purchasing is authorized to issue a rebate payment to an applicant upon notice of certification from the Director of Public Works.
5410.[6] 5 Refund.
Any applicant who has paid a fee pursuant to this chapter may request in writing a refund prior to the commencement of the project for which the fee was paid and permit issued. Upon receipt of the request, the county shall issue a refund, less a 25% administrative fee and less any funds collected for and already paid to a fire protection district for inspection services.
Section B. Severability Clause. If any section, subsection, sentence, clause, or phrase of this Ordinance is, for any reason, held to be invalid or unconstitutional, such decision shall not affect the validity or constitutionality of the remaining portions of this chapter. The Legislature hereby declares that it would have adopted this Ordinance, and each section, subsection, clause and phase hereof, irrespective of the fact that any one or more sections, subsections, sentences, clauses, or phrases be declared unconstitutional.
Section C. Effective Date. This Ordinance and the rules, regulations, provisions, requirements, orders, and matters established and adopted herein, shall take effect and be in full force and effect 90 days from and after the date of its final passage and adoption.
Enacted and Approved
Effective Date: This Ordinance shall be effective immediately upon its signature by the County Executive.
APPROVED AS TO FORM:
_________________________ _______________________________
Deputy/Assistant County Counselor Acting County Counselor
I hereby certify that the attached Ordinance, Ordinance #4171 of November 16, 2009, was duly passed on November 23, 2009 by the Jackson County Legislature. In the votes thereon were as follows:
Yeas 9 Nays 0
Abstaining 0 Absent 0
This Ordinance is hereby transmitted to the County Executive for his signature.
____________________ ________________________________
Date Mary Jo Spino, Clerk of Legislature
I hereby approve the attached Ordinance #4171.
_________________ _______________________________
Date Michael D. Sanders, County Executive