File #: 4316    Version: 0 Name: permit to operate a solid waste and recyclable processing facility
Type: Ordinance Status: withdrawn
File created: 6/6/2011 In control: Land Use Committee
On agenda: 6/6/2011 Final action: 6/13/2011
Title: AN ORDINANCE granting a conditional use permit (CUP) in District LI (Light Industrial) for a period of twenty years to operate a solid waste and commingled recyclables processing facility, also known as a transfer station, subject to specified conditions, as to a 6.36± acre tract.
Indexes: USE PERMIT, WITHDRAWN
Attachments: 1. 4316WD.pdf
                                        IN THE COUNTY LEGISLATURE OF JACKSON COUNTY, MISSOURI
                                                                             WITHDRAWN 6/13/2011
 
Title
AN ORDINANCE granting a conditional use permit (CUP) in District LI (Light Industrial) for a period of twenty years to operate a solid waste and commingled recyclables processing facility, also known as a transfer station, subject to specified conditions, as to a 6.36± acre tract.
 
 
Intro
ORDINANCE #4316, June 6, 2011
 
 
Body
BE IT ORDAINED by the County Legislature of Jackson County, Missouri as follows:
 
Section 1.  A conditional use permit is hereby granted for a period of twenty years to operate a solid waste and commingled recyclables processing facility, also known as a transfer station, as to an approximate 6.36+ acre tract of land specifically described as follows:
Description:  The 6.36 acres are near the intersection of 23rd Street and I-435 Highway in the Blue Summit area and are legally described as all of lots 22 and 23, corrected plat of Blue Summit Industrial Park, a subdivision in Jackson County, Missouri, aka 2211 Television Place.
 
 
Section 2.  The conditional use permit granted by this Ordinance is subject to the following conditions:      
1.  Prior to approval of construction plans and building permits, the applicant shall replat lots 22 and 23 in the corrected subdivision plat for Blue Summit Industrial Park into one subdivision lot.
      
2.  Prior to approval of construction plans and building permits, a drainage study and erosion control plan that addresses water quality as well as storm water controls shall be completed and approved by the Director of Public Works.
      
3.  Prior to approval of construction plans and building permits, the applicant shall provide copies of permits and/or approvals from the City of Independence for water service and Kansas City Water Services Department for sewer services.
 
4.  The transfer building will be a metal building with metal panels having a depth of more than one inch or a thickness of more than U.S. Standard 26 gauge. The wall facing the public street shall have a decorative façade with either face brick, "Cherokee" block, stone or similar material that will be approved by Planning and Environmental Health Division during the building permit plan review process.
 
5.  The interior site roads shall be paved with either asphalt or concrete having a minimum pavement thickness of six inches for asphalt or four inches for concrete. The parking and storage area shown in the northeast corner of the property on the site plan may be gravel provided necessary measures are taken to minimize dust.
 
6.  The applicant shall provide a copy of all necessary Missouri Department of Natural Resources approvals to the Planning and Environmental Health Division prior to applying for any permits that allow the applicant to move forward with site development.
 
7.  The proposed solid waste processing facility must be consistent with the District E - MARC Solid Waste Management District's Solid Waste Management Plan.
 
 
Section 3.  The Legislature, pursuant to the application of Deffenbaugh Industries, Inc. (CU-2011-207), requesting approval embodied in this Ordinance and with notice that the Jackson County Plan Commission voted unanimously to recommend DISAPPROVAL of this application in a public hearing on May 19, 2011, does adopt this Ordinance pursuant to the Jackson County Charter authorizing the Legislature to exercise legislative power pertaining to planning and zoning.
 
 
Enacted and Approved
Effective Date:  This Ordinance shall be effective immediately upon its signature by the County Executive.
 
APPROVED AS TO FORM:
                                          
 
____________________________            _____________________________
Chief Deputy County Counselor                  County Counselor
 
      I hereby certify that the attached Ordinance, Ordinance #4316 introduced on June 6, 2011, was duly withdrawn on June 13, 2011 by the Jackson County Legislature.  The votes thereon were as follows:
 
 
      Yeas _______________                  Nays ______________
 
      Abstaining ___________                  Absent ____________
 
 
This Ordinance is hereby transmitted to the County Executive for his signature.
 
 
________________________                  ________________________________
Date                                          Mary Jo Spino, Clerk of Legislature
 
 
I hereby approve the attached Ordinance #4316.
 
 
_______________________                  ________________________________
Date                                          Michael D. Sanders, County Executive